Record every pass, shot, save and challenge live from the sideline. Then show your child, in black and white, exactly how much they've improved. Season reports, visual charts, goal zone maps. Works offline. No accounts needed.
Skill Track Pro fits into your matchday routine without adding friction — just open, tap, and let the data do the rest.
Tap a button each time your child passes, shoots, saves or challenges. Takes 2 seconds per action.
See the instant summary: success rates, shot zones, minutes played — everything in one clear view.
Generate a full season report showing improvement over every match — proof of how far they've come.
One missed pass doesn't mean a bad game. One bad game doesn't mean a bad season. Skill Track Pro shows the complete arc of development, so your child sees what's actually improving — not just what went wrong today.
A child who won 6 out of 10 challenges is doing well — but if they won 7 last month and 8 the month before, they need support, not just praise. Season reports track success rate match by match so you can see momentum building — or spot a dip early.
Your child attempted 14 passes and won 7 challenges today. Most parents don't know. Skill Track Pro captures every attempt so you can celebrate the effort you almost missed. "You had 4 shots today — more than last match" lands differently than "you played well."
Simple enough to use on the sideline while watching the game. Detailed enough to show your child, match by match, exactly where they're improving — and where to focus next.
Full-screen colour-coded buttons with haptic feedback. Track passes, shots, dribbles, saves, claims, and distributions as they happen.
Toggle between positions mid-match. Outfield tracks Pass, Shot, Dribble, Challenge. Goalkeeper tracks Save, Claim, Long Distribution, Short Distribution.
A 3x3 goal grid shows where shots and saves land. Colour-coded by success and frequency, so patterns emerge across the season. Built for youth goalkeeper performance analysis.
Line charts track success rate match by match. Radar charts show skill balance across action types. See development, not just numbers.
First names only. No accounts. No data leaves your device. The privacy-first youth sports tracking app built for children from day one.
Export your child's stats to CSV. Build a season of evidence that gives them real proof of their own improvement. Back up everything via email and share branded match summary cards.
Name a season and every match is tagged to it automatically. At the end, generate a full season report: success rate trend line, dribble breakdown, challenge breakdown, and shot zone summary. Compare two seasons side-by-side to see how far your child has come.
Every feature works without internet. Data is stored on your device using SQLite. Perfect for pitches with no signal.
Tracks attempts and effort, not just results. Every action recorded celebrates that your player tried. Growth language throughout.
Track playing time with on-pitch and off-pitch stints. See total minutes played per match and across the season.
Available in English, Dutch, German, French, Spanish, Portuguese, Swedish, Norwegian, Danish, Finnish, and Italian. Auto-detects your device language.
Each tap captures rich detail about how your player is developing. Here is what the app records for every action type, along with the breakdowns you will see in your season reports.
Records every pass attempt and whether it reached a teammate.
Tracks every shot with placement detail so you can see where they aim and how accurate they are.
Captures each time a player takes on an opponent and whether they got past them.
Records defensive challenges with outcomes that help identify areas for growth.
Records every save attempt with placement so you can see where they are strongest.
Tracks when the keeper comes to collect the ball and whether they secured it.
Records goal kicks, drop kicks, and long throws. Tracks whether distribution reaches a teammate.
Records short passes and rolls from the goalkeeper when building from the back.
Big, colourful buttons for quick tapping on the sideline. Visual charts and zone maps that reveal real progress. Everything a grassroots football coach needs.
No accounts, no setup, no learning curve. Just download and start tracking.
Just first names — that's all you need. Add players, organise into teams if you like.
Tap the big colour-coded buttons to track actions live. Every attempt is celebrated, whether it succeeds or not.
Charts, zone maps, and pattern insights reveal real development over time. Show your child the evidence they need to believe in themselves.
No subscriptions. No tiers. No hidden fees. Pay once, use forever.
Verified reviews from the App Store.
"I used this today for the first time whilst my son was playing football. Straightforward to use, although I will explore recording more detail for skills as I use it more. It didn't detract me from watching the game and I could show my son how well he did across both halves of the game. His confidence isn't great, so the fact I was able to show him how many successful passes and challenges he had went so much further than me just saying he had a good game. He was really surprised how many shots at goal he'd actually tried which gave him a boost. I'll definitely keep using it and it will be interesting to see his progress across multiple games."
"I used the basic version before but this version is even better and well worth the money. Tracks loads more stats and has the important tracking over time which really helps pinpoint areas for development. The graphs and stats really help visualise the match. My son loves looking at his numbers post game and always seems impressed by what he's done. The ability to see which foot is being used, direction of passes and shot placement are amazing. I've not used the goalkeeper page as my boy doesn't play in goal but that looks really good for keepers. Since I've had it there have been loads of updates and the app keeps getting better. Thank you for a great, cheap app!"
What happens when a grassroots parent tracks every match, exports the data, and sends it to professional clubs.
A grassroots parent tracked their son's matches across a full season using Skill Track Pro — Saturday league games, development centre sessions, and friendlies against academy-level opposition. They exported the data, built a performance CV, and emailed it cold to professional clubs.
The numbers were specific, verifiable, and covered multiple opposition levels. The Head of Recruitment at an EFL Category 3 club replied within hours of receiving the CV, requesting a fixture list so they could send a scout to watch him live.
"The Head of Recruitment replied within hours of receiving the data-backed CV, requesting a fixture list so they could send a scout to watch him live."
Season-long passing accuracy, dribble success rates, and challenge win rates broken down by opposition level — including performance data from friendlies against academy-level opposition.
Every match tracked with Skill Track Pro from the touchline. Season complete, CSV exported. Stats formatted into a one-page performance profile and emailed cold to professional club recruitment departments.
Read the full story and learn how to build a data-backed performance CV
Read the full storySkill Track Pro is now available on Google Play for Android phones and tablets. Also available on Amazon Fire devices via the Amazon Appstore.
Have a question, feedback, or just want to share how Skill Track Pro is working for you? We'd love to hear from you.
The story behind why this app exists — and why the car ride home inspired it.
"I believe that every child playing football deserves to walk off the pitch feeling proud of their effort, regardless of the score."
The inspiration came from the car ride home. My son played brilliantly — then fixated on the one pass he misplaced, ignoring everything else. No matter what I said, he wouldn't believe me. He needed more than encouragement. He needed evidence.
The first time I could show him real numbers — "you made 14 passes and won 7 challenges" — his face changed. That's what Skill Track Pro is for: turning what a parent watched into something a child can actually hold onto. Not just after one match, but across a whole season, so the progress becomes undeniable.
One bad moment doesn't define a match. One bad match doesn't define a season. The numbers prove it.
— Chris Ingledew, Founder
Skill Track Pro stores everything locally on your device. No data is ever sent to a server. No accounts needed. No tracking. Designed with young athletes' privacy in mind. We believe coaching data belongs to you and only you.
Everything you need to know about tracking your child's football development.
Skill Track Pro is a youth football skills tracking app designed for grassroots coaches and parents. It lets you record passes, shots, dribbles, saves, and other actions live during matches using simple colour-coded buttons, then view visual progress charts, shot zone maps, and season-long development patterns.
Yes, Skill Track Pro works 100% offline. All data is stored locally on your device. You don't need an internet connection at the pitch — perfect for grassroots football grounds with no signal.
Absolutely. Skill Track Pro is privacy-first — it only uses first names, requires no account or login, and no data ever leaves your device. It was designed from day one with children's privacy in mind.
Yes. You can toggle between Outfield and Goalkeeper mode during a match. Goalkeeper mode tracks Saves, Claims, Long Distribution, and Short Distribution, with a 3x3 goal zone grid showing where saves are made across the season.
Skill Track Pro is a one-time purchase of £4.99 with no subscriptions, no tiers, and no hidden fees. All future updates are included.
For outfield players you can track Passes, Shots, Dribbles, and Challenges. For goalkeepers you can track Saves, Claims, Long Distribution, and Short Distribution. Every action records success or fail, the game minute, and rich detail specific to each type.
Passes record which foot was used, the direction (forward, sideways, backward), and whether it led to an assist. Shots capture the foot, goal zone placement on a 3x3 grid for on-target shots, or whether it went high or wide, plus goal tracking. Dribbles record whether the player went inside (cutting infield) or outside (down the line). Challenges capture five outcomes: ball won, block, clearance, over commit (went in too eagerly — a learning moment about timing), and under commit (held back — helps spot where confidence can grow).
For goalkeepers, Saves record where in the goal the save was made using the same 3x3 grid. Claims capture the type (cross or through ball) and location (in box or out of box). Long and Short Distribution track whether the keeper's passes reach a teammate, building a picture of their comfort playing out from the back.
Yes. Skill Track Pro is available in 11 languages including English, Dutch, German, French, Spanish, Portuguese, Swedish, Norwegian, Danish, Finnish, and Italian. It auto-detects your device language and works anywhere in the world.
You can export player reports to CSV, share branded match summary cards directly from the app, and back up all your data via email. Everything stays in your control.
£4.99 once. No subscription. Works offline. Start tracking at your next match.